Foot Bridge at Km +11.00 Ismailia - Port Said Road, KSA

Foot Bridge at Km +11.00 Ismailia – Port Said Road, KSA

•The 30m Cable Stayed Foot bridge consists of two equal spans (2x15m). Cables with different lengths are used to support the main girder
 
•Main elements of bridge are welded plate girders using the available plates and sections manufactured in local mills. The12 cm. reinforced Concrete slab decking support on steel beams (cross girder).
Category: .

Product Description

Location

Port Said – Ismaillia Road, Egypt

Client

Ismaillia Governorate (Ismailia Branch)

Scope of services

  • Complete Design Analysis
  • Shop Drawings
  • Steel Fabrication Supervision
  • Supervision of Works